How to prolong the service life of non negative pressure water supply equipment

2017/2/28??????view:

How to prolong the service life of non negative pressure water supply equipment


    As everyone knows, the water pump is used as the core component of non negative pressure water supply equipment, is the key to non negative pressure water supply equipment can operate normally, in addition to the principle of centrifugal pump related knowledge, we have more important is how to conduct the related maintenance of our water pump, to prolong the service life of the water pump non negative pressure water supply equipment, from below the following details should pay attention to what matters to prolong the service life of the water pump.
Preparation of non negative pressure water supply equipment before starting:
1, test motor steering is correct, from the top of the motor to the pump as a clockwise rotation, the test time should be short so as to avoid mechanical seal dry wear.
2, open the exhaust valve to fill the entire pump body, to be closed after the exhaust valve.
3, check each part is normal.
4, with the hand disc pump to make the lubricating liquid into the mechanical seal face.
5, the high temperature type should first run preheating, heating rate of 50 C / h, in order to ensure that each department is heated evenly.
Non negative pressure water supply equipment start:
1, fully open inlet valve.
2. Close the valve.
3, start motor, observe whether the pump is running correctly.
4, adjusting the outlet valve opening to the desired condition, such as the user is equipped with flow or pressure meter at the outlet of the pump, it should adjust the outlet valve opening in the pump performance parameter table rated point operation, if the user is not installed in the pump outlet flow or pressure meter, it should adjust the outlet valve opening; the motor current measuring pump, the motor runs in the rated current, otherwise it will cause the pump overload operation (i.e. current operation, to make the motor burned out) adjustable outlet valve opening is large and small and pipeline related conditions.
5, check the seal leakage, normal mechanical seal leakage should be less than 3 drops per minute.
6, check the motor, bearing temperature rise at less than 70 DEG C.
Non negative pressure water supply equipment shutdown:
1, high temperature before cooling, the cooling rate is not higher than 10 deg / min, the temperature is lowered to below 80 DEG C, to stop.
2. Close the valve.
3, stop motor.
4, close the inlet and outlet valve.
5, such as long-term shutdown, the pump should be put into the liquid.
Through the above several operations related to the maintenance, I believe the pump service life will be greatly extended, better play its due function.







Name: *
tel: *
Question: *
leave your message
圖片看不清?點(diǎn)擊重新得到驗(yàn)證碼
久久综合精品无码av一区二区三区| 日本高清视频www夜色资源| 国产一区二区三区无码免费 | 香港日本三级在线播放| 亚洲人成无码www久久久| 国产熟妇高潮叫床视频播放| 236宅宅理论片免费| 国产av电影区二区三区曰曰骚网| av偷拍亚洲一区二区三区| 亚洲精品国产首次亮相| 日韩精品一二区在线视频| 熟妇人妻中文字幕无码老熟妇| 欧洲成人午夜精品无码区久久| 一本久道综合色婷婷五月| 青青小草av一区二区三区| 饥渴少妇高潮视频大全| 国产成人精品视频网站| 内射夜晚在线观看| 国产精品免费大片| 国产精品久久久久aaaa| 97夜夜澡人人爽人人| 久久久久成人精品免费播放动漫 | 无码国产精品一区二区免费vr| 亚洲综合伊人久久大杳蕉| 精品国产免费一区二区三区| 欧美成年视频在线观看| 中文字幕人妻无码一区二区三区 | 四虎永久免费一级黄片| 久久婷婷国产综合精品| 少妇无码av无码一区| 国产欧美日韩亚洲精品区| 初尝黑人嗷嗷叫中文字幕| 久久久久亚洲av成人无码| 亚洲男同帅gay片在线观看| 少妇特黄a一区二区三区| 久久久精品久久日韩一区综合| 成人18禁深夜福利网站app免费| 人妻暴雨中被强制侵犯在线| 99久热在线精品视频| 婷婷五月综合激情| 日韩一区二区三免费高清|