毛片24种姿势无遮无拦_中国丰满熟妇xxxx性_野狼第一精品社区_久久久精品波多野结衣_色一情一乱一伦一视频免费看

Welcome to zhongying water supply Hunan, China Website
Your Position: Home > Experts > Service Center

How to prolong the service life of non negative pressure water supply equipment

2017/2/28??????view:

How to prolong the service life of non negative pressure water supply equipment


    As everyone knows, the water pump is used as the core component of non negative pressure water supply equipment, is the key to non negative pressure water supply equipment can operate normally, in addition to the principle of centrifugal pump related knowledge, we have more important is how to conduct the related maintenance of our water pump, to prolong the service life of the water pump non negative pressure water supply equipment, from below the following details should pay attention to what matters to prolong the service life of the water pump.
Preparation of non negative pressure water supply equipment before starting:
1, test motor steering is correct, from the top of the motor to the pump as a clockwise rotation, the test time should be short so as to avoid mechanical seal dry wear.
2, open the exhaust valve to fill the entire pump body, to be closed after the exhaust valve.
3, check each part is normal.
4, with the hand disc pump to make the lubricating liquid into the mechanical seal face.
5, the high temperature type should first run preheating, heating rate of 50 C / h, in order to ensure that each department is heated evenly.
Non negative pressure water supply equipment start:
1, fully open inlet valve.
2. Close the valve.
3, start motor, observe whether the pump is running correctly.
4, adjusting the outlet valve opening to the desired condition, such as the user is equipped with flow or pressure meter at the outlet of the pump, it should adjust the outlet valve opening in the pump performance parameter table rated point operation, if the user is not installed in the pump outlet flow or pressure meter, it should adjust the outlet valve opening; the motor current measuring pump, the motor runs in the rated current, otherwise it will cause the pump overload operation (i.e. current operation, to make the motor burned out) adjustable outlet valve opening is large and small and pipeline related conditions.
5, check the seal leakage, normal mechanical seal leakage should be less than 3 drops per minute.
6, check the motor, bearing temperature rise at less than 70 DEG C.
Non negative pressure water supply equipment shutdown:
1, high temperature before cooling, the cooling rate is not higher than 10 deg / min, the temperature is lowered to below 80 DEG C, to stop.
2. Close the valve.
3, stop motor.
4, close the inlet and outlet valve.
5, such as long-term shutdown, the pump should be put into the liquid.
Through the above several operations related to the maintenance, I believe the pump service life will be greatly extended, better play its due function.







Name: *
tel: *
Question: *
leave your message
圖片看不清?點(diǎn)擊重新得到驗(yàn)證碼
麻豆国产精品va在线观看| 特级无码毛片免费视频| 日本成本人三级在线观看| 国产伦精品一区二区三区妓女下载 | 狠狠躁天天躁夜夜躁婷婷| 国产欧美日韩一区二区三区| av在线亚洲男人的天堂| 欧美三级韩国三级日本三斤| 亚洲国产精品一区二区美利坚| 久久精品国产亚洲av麻豆四虎| 国产精品无码一区二区牛牛| 一本久道久久综合狠狠躁av| 亚洲综合av在线在线播放| 日韩精品免费无码专区| 国产成年无码久久久免费| 日韩人妻精品一区二区三区视频 | 久久久久亚洲av无码专区| 日日躁夜夜躁狠狠躁夜夜躁 | 午夜精品久久久久久久喷水| 极品少妇被弄得高潮不断| 国产精品多p对白交换绿帽| 美女黄网站色视频免费国产| 国产精品国产免费无码专区不卡| 午夜时刻免费入口| 中文在线а√天堂官网| 日产精品一卡2卡三卡4乱码| 久久这里只有精品首页 | 国产真人性做爰久久网站| 亚洲中文久久精品无码ww16| 国产精品久久777777| 久久精品国产亚洲av麻豆图片| 人妻少妇av中文字幕乱码| 精品人妻伦一二三区久久| 群交射精白浆视频| 国产亚洲欧美精品一区| 欧美丰满熟妇xxxxx| 农村国产毛片一区二区三区女| 青青青国产免费线在| 日韩狼人精品在线观看| 强辱丰满人妻hd中文字幕| aaa欧美色吧激情视频|